Phase 1 Desk Study for an Office Redevelopment, Longfield

23rd January 2025
Ash House, Longfield

Lustre Consulting was instructed by DHA to undertake a Phase 1 Desk Study for Ash House, a two-storey office building located in New Ash Green, Kent. The project proposed the conversion of the existing commercial space into 14 residential apartments, requiring detailed environmental assessment to ensure compliance with planning regulations and address any potential contamination risks.

Given the site’s history and its proximity to sensitive receptors, our comprehensive Phase 1 Desk Study provided insights to support the planning application and safeguard the redevelopment process.

Site Overview and Development Context

The redevelopment project involved:

Due to the location of Ash House, combined with its historical use as agricultural land, required a targeted environmental assessment to identify and address any potential contamination risks.

Phase 1 Desk Study: Methodology and Findings

Lustre Consulting’s Phase 1 Desk Study combined historical research, site surveys, and regulatory data reviews to deliver a thorough risk assessment. Key elements included:

Supporting Planning Approval

The findings from our Phase 1 Desk Study were compiled into a detailed report submitted to Sevenoaks District Council. By addressing potential contamination risks and providing clear mitigation strategies, Lustre Consulting’s work provided the necessary assurances to support the planning application.

Our thorough desk study supported the planning application, paving the way for the conversion of Ash House into high-quality residential apartments that meet environmental and safety standards.

Read More From Our Knowledge Centre

How we can protect your construction site from unnecessary delays and costs. If piling is part of your construction plans, a piling risk assessment could be a vital step to avoid potential problems that could disrupt your project, including: Piling risk assessments are now explicitly referenced within the Environment Agency’s Land Contamination Risk Management Guidance […]

How we can protect...

A surface water soakaway is used to capture then allow the infiltration and filtration of water runoff through a subsoil to the water table below. Your soakaway should provide sufficient short-term storage of surface water and allow the surface water to percolate into the surrounding ground. The National House-Building Council (NHBC) provides detailed guidance on […]

A surface water...

Working on a construction project can come with a long ‘to do’ list. Not only that, but you have to deal with the stress of navigating planning conditions as well as numerous building regulations. Acoustic issues don’t have to further complicate this process. Could an Acoustic Assessment be a requirement for your site? Of all […]

Working on a...

Contamination is not always something that can be seen; often contamination is invisible, buried below ground or is present in perfectly normal looking topsoil.

This is a question...