Lustre Consulting was appointed by DHA Group to conduct a Phase 1 Desk Study t Caring Stud, Maidstone. The site was earmarked for redevelopment into a residential scheme comprising 13 modern apartments with associated infrastructure. Given the site’s historical use and proximity to industrial activities, the project required careful environmental assessment to address contamination risks, comply with planning conditions, and unlock the site’s potential for development.
Given the site’s historical and current industrial uses, the project required careful assessment to address potential contamination risks, satisfy local planning conditions, and ensure the site was suitable for development.
The site presented several environmental challenges due to its complex historical and current uses:
These challenges raised concerns about contamination risks to future residents, buried infrastructure, and construction workers, which required thorough evaluation to proceed with development.
Lustre Consulting delivered a Phase 1 Desk Study tailored to the site’s needs and Maidstone Borough Councils requirements. Key elements of our approach included:
he study identified several key risks that required mitigation:
To address these risks, Lustre Consulting recommended:
Our recommendations provided clear, actionable steps to ensure the site met planning and environmental safety requirements.
The Phase 1 Desk Study enabled DHA Group to secure planning permission for the development. By clearly identifying risks and proposing targeted mitigation strategies, Lustre Consulting ensured the site was ready for the next phase of development.
Key achievements included:
With Lustre Consulting’s support, the project is now primed for construction, providing much-needed housing while minimising environmental risks.
For expert advice on environmental assessments for residential and commercial developments, contact Lustre Consulting today.
How we can protect your construction site from unnecessary delays and costs. If piling is part of your construction plans, a piling risk assessment could be a vital step to avoid potential problems that could disrupt your project, including: Piling risk assessments are now explicitly referenced within the Environment Agency’s Land Contamination Risk Management Guidance […]
How we can protect...
A surface water soakaway is used to capture then allow the infiltration and filtration of water runoff through a subsoil to the water table below. Your soakaway should provide sufficient short-term storage of surface water and allow the surface water to percolate into the surrounding ground. The National House-Building Council (NHBC) provides detailed guidance on […]
A surface water...
Working on a construction project can come with a long ‘to do’ list. Not only that, but you have to deal with the stress of navigating planning conditions as well as numerous building regulations. Acoustic issues don’t have to further complicate this process. Could an Acoustic Assessment be a requirement for your site? Of all […]
Working on a...
Contamination is not always something that can be seen; often contamination is invisible, buried below ground or is present in perfectly normal looking topsoil.
This is a question...